Carseldine Village

Share Carseldine Village on Facebook Share Carseldine Village on Twitter Share Carseldine Village on Linkedin Email Carseldine Village link

FOR THE LATEST INFORMATION go to carseldinevillage.com.au

Carseldine Village, a new residential community on Brisbane’s northside, is being developed by Economic Development Queensland (EDQ), a government agency that combines property development with specialist planning functions, on the site of the former QUT campus at Carseldine.

Carseldine Village will be an exemplar of sustainable development – the first residential development in Queensland to commit to delivering 100% net-zero energy emission homes with energy-saving features.

On completion, the new village will consist of mixed-use, diverse, and affordable residential, small commercial and retail, along with bushland and recreational open space areas.

At Carseldine

FOR THE LATEST INFORMATION go to carseldinevillage.com.au

Carseldine Village, a new residential community on Brisbane’s northside, is being developed by Economic Development Queensland (EDQ), a government agency that combines property development with specialist planning functions, on the site of the former QUT campus at Carseldine.

Carseldine Village will be an exemplar of sustainable development – the first residential development in Queensland to commit to delivering 100% net-zero energy emission homes with energy-saving features.

On completion, the new village will consist of mixed-use, diverse, and affordable residential, small commercial and retail, along with bushland and recreational open space areas.

At Carseldine Village, 75 per cent of the bushland is being retained and there are more than 18 hectares of green and open space. The Cabbage Tree Creek bushland, called The Sanctuary, is going through rehabilitation works with the planting of 20,000 new plants, trees and shrubs, and the installation of over 200 nesting boxes.

The masterplan for Carseldine Village is proposed to be developed in 5 stages. The current approved masterplan provides for a maximum of 606 dwellings. In one of the future stages, a village retail heart will potentially comprise a convenience supermarket, specialty retail and dining.

The Government Office Precinct, C&K Child Care Centre, and Carseldine Markets remain.

Construction update

Stage 1 construction includes:

  • Stage 1 terrace homes - complete.
  • Stage 1 civil and electrical works - complete.
  • A new entry road into Carseldine Village, called Plaza Place - complete
  • The three intersection upgrades to Beams and Dorville Roads - complete
  • Rockpool Residential Aged Care - complete.

Stage 2 construction includes:

  • Stage 2 terrace homes - under construction.
  • Stage 2 civil and electrical works - complete.

Stage 3A construction includes:

  • Stage 3A terrace homes - under construction.
  • Stage 3A civil and electrical works - complete.

Stage 4A construction includes:

  • Stage 4A civil and electrical works - complete.

Stage 4B construction includes:

  • Stage 4B and 4C civil and electrical works - complete.

Stage V construction includes:

  • Stage V scope of works includes service relocations, demolition of existing C&K building, vegetation clearning, earthworks, underground service installation, retaining wall construction, roadworks, and landscape works. Works are underway


Stage releases

Stage 1 which includes 53 terrace homes is sold out.

Stage 2 which includes 49 terrace homes is sold out.

Stage 3A which includes 15 terrace homes is sold out.

4A Release which includes 10 terrace homes is sold out.

4B Release which includes 13 terrace homes is sold out.

4C Release is now selling with one terrace house and land package remaining.

For enquiries or information, please email hello@carseldinevillage.com.au

The Green

The Green, a new $6.5 million sport and recreation precinct that stretches over four hectares and incorporates the latest technology opened on 11 January 2020.

The Green includes three soccer fields (of which two are dual-purpose soccer/rugby league); two volleyball courts; two dual-purpose tennis/netball courts; a half-court basketball court; an outdoor ping pong table; a turf cricket pitch and synthetic practice nets; an all-abilities playground; yoga lawn; exercise equipment; BBQs, shaded seating, public toilets, and sports change room facilities and more than 120 car parks.

Bookings for the sports facilities at The Green can be made via the Carseldine Village website.

Rockpool Residential Aged Care

Rockpool Residential Aged Care is now open.

A $43 million Residential Aged Care facility. This 6-level, 150-bed accommodation and care facility will offer aged care, respite care and specialist memory support care.

The Rock's Cafe, located on the ground floor of Rockpool Residential Aged Care is also open.

C&K Childcare

The brand-new C&K Childcare Centre next to Rockpool Residential Aged Care is now open.

This new intergenerational care collaboration is a pioneering step towards better social outcomes and innovating the social fabric within residential villages across Queensland.

This new Centre will create opportunities for meaningful social interactions, integrating new ideas to add to the quality of life and social development benefits for the community.

More information

For more information on Carseldine Village, please visit our website on:

View the Carseldine Village development applications below:

EDQ reference

Description

DEV2017/864

Stage S – The Green sport and recreation precinct

DEV2018/932

Masterplan for Carseldine Village

DEV2019/1032

Management lot subdivision

DEV2019/1070

Cabbage Tree Creek pedestrian and cycle bridge

DEV2019/1074

Stage 1 – Terrace lots and aged care/retirement lot

DEV2020/1118

Stage 2 – Terrace lots


  • Beams Road rail level crossing

    Share Beams Road rail level crossing on Facebook Share Beams Road rail level crossing on Twitter Share Beams Road rail level crossing on Linkedin Email Beams Road rail level crossing link

    Department of Transport and Main Roads (DTMR) has commenced works on the Beams Road rail level crossing project. The below links provide details of the works proposed in this area.

    To find out further information on the above project, please contact DTMR on the details below:

  • Community notice - Stage V works - Carseldine Village

    Share Community notice - Stage V works - Carseldine Village on Facebook Share Community notice - Stage V works - Carseldine Village on Twitter Share Community notice - Stage V works - Carseldine Village on Linkedin Email Community notice - Stage V works - Carseldine Village link

    Stage V subdivision works have commenced.

    For further details read the Community Notice

    If you have any concerns please contact alex.bax@shadcivil.com.au or 0412 903 786

  • Community notice - Stage 4B civil works and catch drain works

    Share Community notice - Stage 4B civil works and catch drain works on Facebook Share Community notice - Stage 4B civil works and catch drain works on Twitter Share Community notice - Stage 4B civil works and catch drain works on Linkedin Email Community notice - Stage 4B civil works and catch drain works link

    Stage 4B civil works and catch drain works have commenced.

    For further details read the Community Notice

    If you have any concerns please contact alex.bax@shadcivil.com.au or 0412 903 786

  • Community notice - Survey and investigation works - Beams Road

    Share Community notice - Survey and investigation works - Beams Road on Facebook Share Community notice - Survey and investigation works - Beams Road on Twitter Share Community notice - Survey and investigation works - Beams Road on Linkedin Email Community notice - Survey and investigation works - Beams Road link

    Survey and investigation works will be carried out on Beams Road from Monday 21 November to Wednesday 23 November from 8pm-5am.

    Works will be carried out at night to ensure the safety of motorists and workers, and to minimise traffic disruptions.

    For further details please read the notice by Utility Location Services here

    If you have any concerns please contact the team on 0455 660 474 (business hours) or 1300 001 857 (24 hours) or admin@utilitylocationservices.com.au.

  • Community notice: temporary road closure - Plaza Place - Friday 11th November

    Share Community notice: temporary road closure - Plaza Place - Friday 11th November on Facebook Share Community notice: temporary road closure - Plaza Place - Friday 11th November on Twitter Share Community notice: temporary road closure - Plaza Place - Friday 11th November on Linkedin Email Community notice: temporary road closure - Plaza Place - Friday 11th November link

    Temporary road closure of the end of Plaza Place, Carseldine, Friday 11th November. Traffic Control Innovations and Shadforth Civil will be working between the hours of 6.30am - 6pm.

    NOTE: there will be no through road connection to Dorville Road.

    For further details, please read the notice by Traffic Control Innovations here

    If you have any concerns please contact rangi@tcinnovations.com.au or 0438 229 603

  • Community notice: Development Application lodged - Carseldine Village - Drainage swale and maintenance access track works including vegetation clearing, earthworks and landscape works

    Share Community notice: Development Application lodged - Carseldine Village - Drainage swale and maintenance access track works including vegetation clearing, earthworks and landscape works on Facebook Share Community notice: Development Application lodged - Carseldine Village - Drainage swale and maintenance access track works including vegetation clearing, earthworks and landscape works on Twitter Share Community notice: Development Application lodged - Carseldine Village - Drainage swale and maintenance access track works including vegetation clearing, earthworks and landscape works on Linkedin Email Community notice: Development Application lodged - Carseldine Village - Drainage swale and maintenance access track works including vegetation clearing, earthworks and landscape works link

    We wish to notify you that a Development Application for Operational Work was properly made on 21 September 2022. This new Development Application proposes the construction of a new drainage swale and maintenance access track. These works include vegetation clearing, earthworks and landscape works.

    Details of the Development Application can be found here: DEV2022/1329

  • Community notice: Traffic diversion – Promenade Street access to The Green

    Share Community notice: Traffic diversion – Promenade Street access to The Green on Facebook Share Community notice: Traffic diversion – Promenade Street access to The Green on Twitter Share Community notice: Traffic diversion – Promenade Street access to The Green on Linkedin Email Community notice: Traffic diversion – Promenade Street access to The Green link

    BMD advise that due to the Carseldine Village development and associated road works, a section of Promenade Street will be temporarily closed from 28 September 2022 till 16 October 2022, to allow for the planned roadworks to take place.

    For further details, please read BMD’s latest construction update.

  • Community notice: Development Application lodged - Carseldine Village Stage V (future Village Heart precinct)

    Share Community notice: Development Application lodged - Carseldine Village Stage V (future Village Heart precinct) on Facebook Share Community notice: Development Application lodged - Carseldine Village Stage V (future Village Heart precinct) on Twitter Share Community notice: Development Application lodged - Carseldine Village Stage V (future Village Heart precinct) on Linkedin Email Community notice: Development Application lodged - Carseldine Village Stage V (future Village Heart precinct) link

    We wish to notify you that the Stage V Development Application was properly made on 2 September 2022. This new Development Application proposes three lots for future development, one public plaza lot, one lot for drainage infrastructure and a new road. Collectively these lots form the future Village Heart precinct.

    Details of the Development Application can be found here: DEV2022/1321

  • Public notification of two applications for PDA Development Approvals - extended submission period

    Share Public notification of two applications for PDA Development Approvals - extended submission period on Facebook Share Public notification of two applications for PDA Development Approvals - extended submission period on Twitter Share Public notification of two applications for PDA Development Approvals - extended submission period on Linkedin Email Public notification of two applications for PDA Development Approvals - extended submission period link

    Interested parties are invited to lodge a formal written submission providing feedback on the:

    • Request for a Change to the PDA Development Approval for the Carseldine Village Masterplan, which also included a Development Permit for Reconfiguration of a Lot (DEV2018/932), and/or
    • PDA Development Permit for Reconfiguring a Lot (Stage 4B of Carseldine Village – 25 residential terrace lots and new road) and Material Change of Use (Plan of Development for Dwelling House and Home-Based Business) (DEV2022/1285).

    You can view the applications here by searching DEV2018/932 and DEV2022/1285, or search ‘Carseldine’.

    The original closing date for submissions was 5.00 pm on Friday 17th June 2022. This has been extended to 5:00 pm on Thursday 30th June 2022.

    How to get involved:

    You can lodge a formal submission via:

  • Public notification of draft DCOP

    Share Public notification of draft DCOP on Facebook Share Public notification of draft DCOP on Twitter Share Public notification of draft DCOP on Linkedin Email Public notification of draft DCOP link

    A draft Development Charges and Offset Plan (DCOP) has been prepared for the Fitzgibbon Priority Development Area (PDA).

    The draft DCOP identifies relevant development charges, how these charges are calculated, levied and administered, and the trunk infrastructure required to service the PDA.

    All interested parties and stakeholders are invited to view the draft DCOP and provide feedback during the 20 business day submission period from Monday 9 May until 5:00 pm on Friday 3 June 2022.

    You can lodge a formal submission via:

Page last updated: 17 Apr 2024, 11:30 AM